Nature, Published online: 04 March 2026; doi:10.1038/s41586-025-10045-7
FT Videos & Podcasts
,详情可参考新收录的资料
A 2016 DOE report found at least 70% of the reserve’s infrastructure and equipment was “exceeding its serviceable life.” In a Congressional testimony last year, Wright said the rapid drawdown in 2022 had further damaged the reserve’s structure, and that repairing the facilities and bringing them back to full capacity would cost in excess of $100 million.
Что думаешь? Оцени!
。关于这个话题,新收录的资料提供了深入分析
Что думаешь? Оцени!,推荐阅读新收录的资料获取更多信息
Последние новости